August 8 2009 build

From Skyscraper
Jump to: navigation, search
This is the article of a development build of Skyscraper Simulator.
It has been confirmed a good-faith contribution to the Skyscraper wiki.

This build has a fix that makes sound support optional (it'll switch off sound if the sound libraries fail to load), and a script interpreter cleanup. The main feature is new elevators in the Glass Tower building. Three basic glass elevators were added, and a service elevator in around the same position as the main service elevator in the building has been added, with the actual floors that it went to in the movie. Some problems are the fact that the Promenade Room in the movie starts at 135 and dips down halfway into 134 towards the front of the building; currently this model has the entire floor on 134. Also the glass elevators supposedly stop at the mezzanine level in the movie, but stop at the ground level in this model. The plaza atrium lobby hasn't been made yet either. Also you'll notice that the floors and ceilings extend outside the building; this is due to the fact that my extents code hasn't been finished (which detects positions of angled walls).

http://www.skyscrapersim.com/downloads/dev

Screenshots:
http://www.skyscrapersim.com/screenshots/dev_pics/1.5/8-8-09/

For some of my Glass Tower information, here you go:
http://www.skyscrapersim.com/tti
and
http://ryan.tliquest.net/Towering%20Inferno/

See Also